Organization
TSMC
Taiwan Semiconductor Manufacturing Company, the world's largest contract chipmaker (manufactures most leading AI accelerators)
- Score
- —
- 95% interval
- —
- Resolved
- 0
- Record (C–P–W)
- 0–0–0
- Open
- 1
- Too vague
- 0
Not ranked yet: leaderboards need at least 5 resolved claims (has 0). Score = specificity-weighted average of claim points; we grade claims, not people.
Promise tracker
Kept 0 Partly 0 Broken 0 Pending 1
Calibration
No resolved claims with a stated probability yet, so there is nothing to calibrate. Calibration needs forecasts like “70% chance of X”.
Track record
Open (1)
TSMC's second Arizona fab (3nm) to begin volume production in Q3 2027, slightly ahead of schedule
“Volume production will begin in third quarter 2027, slightly ahead of our previous schedule.”
Embed / Cite
The embedded card is live and shows the current score and record, with the date the data was read.
Right of reply: send a correction or response.